Bath Ramblers

This page highlights a number of tasks carried out by the BRAM team. Our intention is to refresh this every few months, so please revisit from time to time!

Replacing wooden gate with sheep-proof metal kissing gate at Publow

An old wooden gate at Publow had become unserviceable, allowing sheep to escape. We were working in an idyllic setting above the church.

Before

publow gate before

After - That should keep the sheep in now!

publow gate after

First we cleared the site and started digging the holes.

publow gate stage 1

The gate was installed and we dug more holes for the cage.

publow gate stage 2

Some final touches and the gate was complete.

publow gate stage 3

 

 

Replacing two stiles with a kissing gate at Nempnett Thrubwell

This proved to be an epic struggle, hampered by a tree growing right where the kissing gate cage needed to go, by a sheet of rock that had to be chiselled through to get the cage legs planted, and by water from previous heavy rain pooling in the bottom of all the holes! All in all, one of the team's latest finishes!

 Work getting underway20170202 0001

After

20170202 0003

Repairs to steps and gate at Compton Martin

Before

20170120 Compton Martin broken handrail posts

After

20170127 Compton Martin fixed handrail posts

 

Tasks at Stowey

Repairs to broken stile

Before

 20170120 Stowey broken stile at top of steps

After

 20170127 Stowey fixed stile at top of steps

 

Reinstating previously disused stile

Before

 20170120 Stowey overgrown stile on road side

After

 20170127 Stowey stile reinstated by main road

 

Clearing a path at the top of a bank

Before

 20170120 Stowey path to clear at top of bank

After

 20170127 Stowey path cleared at top of bank